Plywood, Formwork and Scaffold Gallery

Royal Form LVL 95 x 65 used as joists to form the suspended slab soffit.

E-Form LVL 95 x 65 used as joists and formply laid to form the suspended slab soffit.

Hardwood Timber Pegs and LVL Edgeform used to form edges of slab on ground.

LVL Edgeform used as edges for Tilit Up Concrete Walls

The Special Royal Prop No.00 for those special small strutting suspended slabs less than 1m high.

E-Form LVL 95 x 65 used as walers (horizontal member) and soldier (vertical member) for a formed wall application.

Royal Form LVL 95 x 65 used as walers (horizontal member) and soldier (vertical member) for a formed wall application.

Royal Form LVL 95 x 65 used as joists and formply laid and nailed down to joists to form the suspended slab soffit.

Truform LVL 95 x 65 and column clamps used to form freestanding concrete columns application.

Oregon Timber 4 x 2 and column clamps used to form concrete columns under the formed suspended slab.

Formply used as the Formwork deck for a concrete soffit of suspended slab.

A progressive formwork deck with Royal Frames System, comprising of Royal Frames, Cross Braces, Flat and U Head Jacks, Royal Form LVL 150 x 75 Bearers and LVL joists and formply.

A progressive formwork deck with Royal Frames System, comprising of Royal Frames, Cross Braces, U Head Jacks, LVL 150 x 75 Bearers and LVL joists.


Class 2 Formwork, shutter using the coil tie springs system

Royal Form LVL 95 x 65 used as walers (horizontal member) and soldier (vertical member) for a formed wall application.

Royal Frame Extension and Royal Flat Jack and the Royal U Head Hat used at the overlapping junction of the Bearer LVL 150 x 75 for a suspended slab application.

Condeck sheets are 300mm wide makes quick and easy to handle and easy to place.

Shoring frames, cross braces and Inner Props and adjustable collars and LVL 150 x 75 are the temporary support for Condeck permanent steel decking.

Permanent Condeck sheets laid for suspended slab application. The (yellow) Royal Penetration Covers placed over the open column holes prevents personnel on the deck fall down the holes.

The Royal Penetration Cover 1200mm x 1000mm are standard size safety cover for open penetration in formed or concreted slabs, to prevent personnel falling through the hole. The mesh design provides the hole to be seen and provides light through the penetration to the deck below.

Superib mesh used as a construction joint between concrete slabs.

The Royal Handrail Post which slides into and locked into the 150 x 75 LVL bearer end which provides a handrail post to the formed deck.

The Royal Electrical Lead Stands provides electrical cords to be suspended off the ground, the lead stand top has multiple slots to hold a number of cords and the steel feet have nail holes so that the lead stand can be safely secured down to the formwork deck prevent dislodgement.

The Royal Inner Prop and Adjustable Collar provides more flexibility with an additional strutting height and the Royal U Head Hat used at bearer 150 x 75 overlapping junctions.

Royal special 900mm wide frame. Ideal to be used for conventional slabs where there are narrow widths restrictions and/or together with Royal Dek Panel system.

The Royal Dek Panel Slab System is light to handle and easy to use to form suspended slabs safely from the ground.

The Royal Dek Panel System is a simple system panels and props and using the 900mm wide Royal frames as the bracing bays.

The Royal Formstage is specially designed to support concrete loads and provides the full safety to the workers, especially for high strutting areas and it provides the Royal Dek Panels to be used for the suspended slab.

The Royal Formstage System is a metric 900mm x 1800mm scaffold grid which enables the Royal Dek panels to be used directly on top jacks and it also incorporates a catchdeck for safety.

The Royal Formstage System is simple to erect and dismantle, clean and fast to use.

The Royal Metal Mesh Plank and the Royal Spacer Bar provides a safety platform for Formworkers while erecting and dismantling formwork. The light weight mesh planks have hooks at ends to safely and securely hook over frames and provides a captive catchdeck for high strutting slabs.